Saturday, 19 May 2012

Day 2 - 25th March

Base Assembly
The second day was primarily a day of assembling the base from the panels cut the previous day. The T-Molding has been installed in the lower picture to check for fit and also to give a better idea of what it will look like when complete.
Base Assembly with T-Molding installed

No comments:

Post a Comment